We developed a custom solution for model UCD-DPC1B-1216-HBS0-H3P. Selected when multi-turn absolute feedback is required via Profibus, using a 58 mm blind hollow structure with 11 mm shaft, without battery-based turn counting. Typical production lead time: 15 working days.
Key Specifications
- Interface: Profibus DP (DPV0 / DPV1 / DPV2 Class 2)
- Resolution: 16-bit single-turn + 12-bit multi-turn (binary)
- Multi-turn: self-powered magnetic counter, no battery, no gear train
- Supply: 10–30 VDC
- Protection: IP65 shaft side, IP66/IP67 housing
- Structure: 58 mm blind hollow, 11 mm shaft, 28 mm depth
- Speed: up to 12000 rpm
Decision Snapshot
- Best for: Profibus-based distributed absolute positioning systems
- Key fit: 11 mm hollow shaft with 58 mm flange, 28 mm insertion depth
- Avoid if: system requires incremental output or non-Profibus communication
Custom Solution Photos


Encoder structure reference: 58 mm blind hollow flange, 11 mm shaft, radial connection box with bus in/out layout.
Bus Configuration & Communication
- Interface class: Profibus Class 2 with configurable node and scaling
- Cycle time: ≥1 ms
- Transmission rate: up to 12 Mbaud
- Functions: preset, scaling, direction, node setting, diagnostics
Primary integration risk: incorrect node addressing or termination setting.
Best practice: confirm bus topology and address allocation before power-up.
Battery-free multi-turn retention removes maintenance dependency. This is a selection advantage in long-cycle systems where access is limited.
Mechanical & Installation Focus
- Bore: 11 mm, depth 28 mm
- Housing: corrosion-protected steel, stainless shaft
- Speed capability: 12000 rpm
Primary mechanical risk: misalignment under blind hollow installation.
Key constraint: shaft tolerance and insertion depth must be controlled, not just diameter.
High-speed operation increases sensitivity to eccentric mounting. Alignment should be treated as a first-step condition, not a final adjustment.
Wiring & Bus Topology
- Radial connection box with bus-in / bus-out routing
- Signals: Bus A, Bus B, power supply, GND
- Addressing: manual setting (0–99)
- Termination: integrated switch
Primary commissioning issue: incorrect termination or bus continuity.
Check sequence: address → termination → bus continuity → power.
Integration & Compatibility
- Designed for Profibus absolute encoder systems with distributed control
- Matches 58 mm blind hollow installation, 11 mm shaft applications
- Suitable for multi-turn positioning without battery maintenance
- Not suitable for incremental systems or non-Profibus architectures
Lead Time
Typical production lead time: 15 working days. Custom adaptation available for shaft fit, connection layout, and node configuration.
Key Technical Data
| Item | Data |
|---|---|
| Model | UCD-DPC1B-1216-HBS0-H3P |
| Interface | Profibus |
| Profile | DPV0 / DPV1 / DPV2 Class 2 |
| Type | Absolute multi-turn |
| Sensing | Magnetic |
| Resolution | 16 bit + 12 bit |
| Multi-turn | Self-powered, no battery |
| Code | Binary |
| Supply | 10–30 VDC |
| Protection | IP65 / IP66-IP67 |
| Flange | 58 mm blind hollow |
| Shaft | 11 mm |
| Depth | 28 mm |
| Speed | 12000 rpm |
| Connection | Radial, bus in/out |